Deskripsyon
Development construction in the NE corner is Sherman and Super has eroded the soil under the Harrisburg Trail causing risk of collapse, This is a serious safety hazard and should be fixed promptly and construction should be stopped until it is fixed.
ay nagtanong din...
T. Additional Information
S. na
S. na
T. What is the priority?
S. High
S. High
T. Why is this a concern?
S. safety hazard due to risk of trail collapse.
S. safety hazard due to risk of trail collapse.
T. Where is the problem located (other than the specified address)?
S. underneath the Harrisburg trail
S. underneath the Harrisburg trail
T. When was the problem first noticed?
S. ika-27 ng Enero ng 2024 14:34
S. ika-27 ng Enero ng 2024 14:34
9 Komentos
Kinilala Houston, TX (Beripikadong Opisiyal)
Houston, TX (Beripikadong Opisiyal)
Houston, TX (Beripikadong Opisiyal)
Referred to Public Works
Houston, TX (Beripikadong Opisiyal)
Houston, TX (Beripikadong Opisiyal)
Houston, TX (Beripikadong Opisiyal)
Houston, TX (Beripikadong Opisiyal)
Houston, TX (Beripikadong Opisiyal)
Explained reason for visit. Contractor is aware of erosion
due to Heavy rain, location of erosion is a retention
pond being dug for active construction site and is being
addressed. Task closed.
Isinara Houston, TX (Beripikadong Opisiyal)
Thank you for submitting this request (#2400036738).
Status: Service Completed
Resolution:
Upon arrival at 117 Eastwood St. I37 met with contractor. Explained reason for visit. Contractor is aware of erosion due to Heavy rain, location of erosion is a retention pond being dug for active construction site and is being addressed. Task closed.